1、 High end customized coating production line, suitable for PET/PI functional film production
The 48 meter three-layer slope flow coating machine delivered this time is specially designed for PET and PI film substrates. It adopts a four layer die head three-layer synchronous slope flow extrusion water-soluble coating process, which can complete multi-layer precision coating and drying curing of adhesives, release agents, and functional coatings, and construct micrometer level functional coatings on the surface of the film material.
The equipment is widely used in high-end new material manufacturing fields such as optical films, release films, capacitor films, and protective films.
The entire process flow: unwinding → traction → three-layer slope flow coating → infrared hot air circulation oven → oven outlet correction → secondary unwinding → traction → cooling composite → winding.
2、 Core equipment highlights, achieving micrometer level high-precision coating
✅ Operating performance: maximum mechanical speed of 130m/min, production speed of 120m/min, maximum feeding width of 1600mm;
✅ Coating die: made of 15-5PH precipitation hardened steel, with a hanger shaped semi-circular composite cavity structure, providing strong coating stability;
✅ Process control: The precise tension system is paired with a constant temperature oven, adapted to the high modulus and low elongation characteristics of PET, achieving a coating accuracy of ± 1 μ m;
✅ Strict acceptance standards: set high standards in dimensions such as edge accuracy, dynamic balance of guide rollers, operating noise, and film bonding error rate to ensure long-term stable mass production.
3、 Intensify on-site construction, please stay tuned for completion and trial operation
At present, the professional engineering team of Alliance Machinery is stationed in the customer's factory area, carrying out work such as rack horizontal calibration, pipeline layout, electrical wiring, and unit module debugging in an orderly manner.
There are still half a month left until the completion of the entire machine and the full line linkage test run. After the project debugging is completed, we will release a full load test machine live video as soon as possible to visually display the operation effect of the production line. Welcome to continue following!










Business hotline: 13922900580
Email: tongmeng@tong-meng.com
Address: Factory Building No. 12, 2nd Road, Wentang Ci Xia Industrial Zone, Dongcheng Street, Dongguan City, Guangdong Province